Bookmark and Share
 
Transport Museum

Tramway Managers

site hit counter
 
visitors since 21st July 2005

The Line: Phase 2
 

 
 
 

 
Early stages of phase two construction. Shore Road looking at Pacific Road Shed. (pic. M Mercer)  
Shore Road passing loop. (pic. M Mercer)


Shore Road passing loop. (pic. M Mercer)


The road to Egerton Bridge. (pic. M Mercer)

 
   
Egerton Bridge terminus looking back toward the loop. All the land to the left is now a landscaped car park while to the right stands the new Wirral College. (D.Pendleton)
 
The terminus at Pacific Road 10th March 1996 (D.Pendleton)   
The passing loop under construction at Pacific Road
 
Beyond the loop  
Approaching the crossing over Shore Road, Egerton
Bridge in the distance
 
Crossing Shore Road 10th March 1996  

 
The "long straight" up to the terminus at Egerton Bridge  
The terminus at Egerton Bridge looking toward Pacific Rd, the tall building on the left is a Mersey Tunnel ventilation shaft. (pic. M Mercer)
 
Crossing Shore Road  
Crossing Shore Road
 
10th March 1996. (D. Pendleton)  
10th March 1996. (D. Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)
 
23rd June 1996.
(D.Pendleton)
 
 
23rd June 1996.
(D.Pendleton)




23rd June 1996.
(D.Pendleton)

 
   
The passing loop, looking toward
Egerton Bridge, 18th May 1996. (D.Pendleton)